Skip to content

Planning

Turn vague requests into implementation-ready tickets

Design briefs and ambiguous asks become structured work items with acceptance criteria, visible progress, and reviewable output expectations.

The request: make switching projects less confusing

Fictional example: a workspace owner says, ‘I keep editing the wrong project after switching. Make the current project obvious.’ The request names a problem, but leaves the location, interaction and success checks open.

The brief another builder can use

Example output, written for review. No customer data or completed work is represented here.

  1. 1. User and outcome

    A workspace owner switching between two projects can identify the current project before making an edit.

  2. 2. Scope

    Show the current project name in the existing navigation and mark it in the project switcher. Preserve routes and existing permissions. Exclude new dashboards and a navigation redesign.

  3. 3. Interaction

    Open the switcher by keyboard, choose a project, then return focus to its trigger. The name updates after a successful switch; a failed switch preserves the current name and shows an error.

  4. 4. Acceptance criteria

    Given Project A is open, selecting Project B updates the visible name and active item. Keyboard users can select and dismiss. At 375px the name and switcher remain usable. A failed switch never labels A as B.

  5. 5. Evidence and handoff

    Attach desktop/mobile captures, keyboard results and a failed-switch check. Record changed files and unresolved issues for the next session. All checks are pending in this example.

  6. 6. Open decision

    Confirm how long project names should be displayed before implementation. The human reviewer agrees the scope and criteria before authorizing work.

Next step

Keep the agreed brief with the work

Once the scope is agreed, record the criteria and implementation notes in a shared ticket.